Andrea Riva

Monza e Brianza, Italia

Summary

Head of the Building Solutions division which includes the
GASBETON autoclaved aerated concrete construction system,
GLAPOR cellular glass insulators and other silicate hydrate insulators
of football

Experience

Bacchi SPA
Technical and Marketing Manager
January 2016 - Present
Boretto (RE)

Xella Italia srl
Field Engineer
January 2008 - December 2015 (8 years)
Grassobbio (BG)

Qbuilding spa
Account Manager
November 2005 - January 2008 (2 years 3 months)

CMB scarl
Resident Project Control
April 2002 - October 2005 (3 years 7 months)

Milan fair
Project Control
2000 - 2002 (3 years)
Training

Politecnico di Milano
Degree, Architecture

SEMINARS

22 Sep 2020 | 17.00 - 19.00

Energy performance and mineral building systems: combining building renovation and new constructions

Partner: Bacchi
Gasbeton walls and floor insulation with Bacchi glass-cell
30 Oct 2019 | 17.00 - 19.00

High energy performance buildings and mineral construction systems

Partner: Bacchi
SOLD OUT Gasbeton walls and floor insulation with Bacchi glass-cell
18 Sep 2019 | 17.00 - 19.00

Buildings with high energy performance and mineral construction systems (2nd edition)

Partner: Bacchi
SOLD OUT Building construction
16 Oct 2018 | 17.00 - 19.00

Building envelope and energy performance. Redevelopment and new construction

Partner: Bacchi
SOLD OUT Renovated building
21 Mar 2018 | 17.00 - 19.00

Redevelop the existing one. Between private buildings and historic buildings

Partner: Bacchi